Dear Friends,
While we talk about project management sometimes we mean construction site management, and sometimes scheduling and planning, what is the difference between each of them, looking for expert opinions..
 

مواضيع مماثلة

sherif Badr

عضو جديد
إنضم
17 ديسمبر 2008
المشاركات
1
مجموع الإعجابات
0
النقاط
0
I will start with the easy ones
Scheduling means developing a workable scheme to reach a certain deliverable for, example to achieve a structure work for a double story villa you have to schedule what needs to be done to reach that goal i.e. foundations, columns and slabs.
Scheduling involves breaking down the items, assigning resources and sometimes incorporate cost.
Planning means identifying the road map, milestones and steps needed to reach a goal.
Planning could be applied over scope, time, quality and other knowledge areas
 